Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Scroll Ignore

 Download PDF version of this document.


CompanyTrenz Electronic GmbH
PCN NumberPCN-20240614 
TitleTE0706-03 to TE0706-04 Hardware Revision Change
SubjectHardware Revision Change
Issue Date

2024-07-0108

Products Affected

This change affects all Trenz Electronic TE0706 SoMs: TE0706-03*.

Affected Product

Changes

Replacement
TE0706-03#1 ... #25TE0706-04-A
TE0706-03-D#2 ... #25TE0706-04-B

Changes

#1 Changed resistor (R39) from not fitted to

...

fitted.

Type: BOM Change

Reason: Do not allow floating signal "OTG_ID".

...

Impact: Mechanical component size increased.Preceed checking from here:

#6 Changed ETH PHY (U6) power supply to use internal LDOs.

...

Impact: JTAG-only boot mode can be selected with DIP switch S1 for Zynq modules.

#12 Changed

...

ferrid bead (L3, L5) from BKP0603HS121-T to MPZ0603S121HT000.

Type: BOM Change

Reason:EOL of component.

...

Reason: Follow Trenz module connection table.

Impact: None.

#18

...

Type: Schematic Change

Reason: BOM Optimization.

Impact: None. 

#19 Added jumper (J14 ... J18).

Type: Schematic Change

Reason: BOM Optimization.

Impact: None. 

...

Removed track-it traceability pad S/N.

Type: Schematic Change

Reason: EOL of Component.

Impact: None.

...

#19 Changed fiducials to standard fiducial type.

Type: Schematic Change

Reason: Use standard fiducials.

Impact: None.

...

#20 Updated Trenz address.

Type: PCB Change

Reason: Update address.

Impact: None.

...

#21 Added UKCA- and RoHS-logo.

Type: PCB Change

Reason: Improve product classification.

Impact: None.

...

#22 Updated components from library.

Type: Schematic Change

Reason: Use latest component data.

Impact: None.

...

#23 Added legal notices, block and

...

power diagram. Updated revision history. Updated page count and order. 

Type: Documentation Update

...

Production Shipment Schedule

From January March 2025, after old stock is gone. If the new revision is not suitable for your application and still the former revision of the board is needed, please contact us.

...